We know not everyone speaks construction. Visit our Construction Terminology page for common industry terms and definitions.
Serotonin Med Spa
Jacor Construction completed the full demolition and luxury build-out of Serotonin, a 2,500-square-foot med spa located in Del Mar, California. The project featured custom cabinetry, premium flooring, architectural lighting, detailed ceiling design, HVAC integration, and modern glazing throughout the space.
A major component of the project involved repairing an unstable subfloor across the entire suite while maintaining full protection and zero disruption to the occupied tenant space below. The completed space delivers a refined, high-end environment designed with a strong emphasis on craftsmanship, precision, and elevated finishes.
Paradigm Clinical Research
Jacor Construction completed a 3,800 SF medical tenant improvement project for Paradigm Clinical Research in Mission Valley, San Diego, delivering a modern clinical environment designed to support advanced patient care and research operations. The project required detailed coordination, specialized medical construction standards, and precision execution throughout every phase of the build.
The scope of work included exam rooms, procedure areas, nurse stations, administrative offices, patient waiting areas, upgraded MEP systems, medical-grade finishes, and coordination with medical equipment providers to ensure a seamless and fully functional healthcare environment.



